Need of oxygen dosing in super critical powerplants?

Answers were Sorted based on User's Feedback



Need of oxygen dosing in super critical powerplants?..

Answer / sanky

to reduce flow assited corrosion
dosed at deaerator and CPU( condensate polishing unit)
o/l

Is This Answer Correct ?    13 Yes 0 No

Need of oxygen dosing in super critical powerplants?..

Answer / ka

By dosing oxygen we can maintain Magnetite(Fe3o4) layer damaged free

Is This Answer Correct ?    7 Yes 0 No

Need of oxygen dosing in super critical powerplants?..

Answer / gopi krishna

by oxygen dozing, hematite layer is formed on magnetite layer. Which is denser so that there is less resistance to water flow compared to AVT.

Is This Answer Correct ?    2 Yes 0 No

Need of oxygen dosing in super critical powerplants?..

Answer / chinmay kumar patra(npti)

In super critical flow is high.to reduce the corrosion due to flow oxygen is dozed which forms magnetite layer to prevent corrosion.

Is This Answer Correct ?    0 Yes 3 No

Need of oxygen dosing in super critical powerplants?..

Answer / ajit

To know the organic matter present in the raw water

Is This Answer Correct ?    0 Yes 4 No

Post New Answer

More Power Plant Engineering Interview Questions

why the steam turbine is not operated in home(base) load more than 1 hour kindly calrify

4 Answers   TATA,


a gas turbine have how many thermocouples?

2 Answers   DEWA,


why IBD Vent is kept at higher elevation than CBD ?

5 Answers  


what is the trip circuit supervision in an electrical meaning?

0 Answers   IOCL,


Why attempration spray is used after hp heater?

5 Answers   CMJ Breweries Private Ltd., Thermax,






some one can tell me how residual type excitation is provided through transformers to an AC generator without any battery or PMG&excitor

0 Answers   UMT,


What is excitation current and voltage in hydro power plant ?

1 Answers   ISS, Perfect Line,


what is need of primary water system in power plant?

1 Answers   JO, MPL,


Why we need to maintain furnace and secondary air dp.if it increase or decrease what happens.

1 Answers  


why the Steam Turbine(20MW)center line and gear box center line not in same elevation during coupling alignment ?

3 Answers   Greenesol Power Systems,


what are all the pre commissioning activities in WTP in power plant

1 Answers  


explain why direct on line starting toque and current may not be acceptable

2 Answers   Avon Organics,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)