how can calculate qty of steel required for one or two ways slabs..
Answer / ayaz ahmed
By knowing the area of slab (l*b*t) and spacing between the main and distribution bars ...
| Is This Answer Correct ? | 0 Yes | 0 No |
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
M30 me kitan pani lagat hai
Cemen-1 Fine agr.-2 Core agr.-3 calculate for per 100 qube feet (qubic feet wise)
Explain your project management?
2 Answers HNB Engineers, Shell,
how can we find out the ratio of cement and sand in plastering
what is tensile strength of {6,8,10,12,16,20}mm dia bar? also there were any formula?
in how much square meter of slab we are providing a beam it may be oneway or twoway slab.
Which is the direction of negative angle?
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
What is the ratio of cement, sand, aggregate of mix M25
20 Answers CCCL, Sarvottam Cement,
Describe the sections included in a typical bill of quantities
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)