how can calculate qty of steel required for one or two ways slabs..
Answer / ayaz ahmed
By knowing the area of slab (l*b*t) and spacing between the main and distribution bars ...
Is This Answer Correct ? | 0 Yes | 0 No |
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.
how to calculate cement mortor for wet and dry mix for different ratios
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
0 Answers College School Exams Tests,
How much is the cover for slab?
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
1 m^ 3 of concrete 150 x150 mm of spacing of required of steel ?
What is reinforced concrete?
what should be the deduction for bend in stirrups while calculating cutting length? Is it 1 dia at each bend?
in built up area basis what is ratio of concrete & steel ratio may be consider in per sqft quantity
why cylinder for split tensile strength test ?
what is the compresive strength of m20 concrete at 7 day
what is the actual productivity of carpentor,fitter,masson for brickwork and masson for plaster etc