how to calclate the cemment for 1 cubic metre of 1:2:4 concrete
Answer Posted / khan9219362784
1 cum of 1:1:4 concrete
Dry volume equal is 1.52
Cement equal is 1/6*28.8*1.52 =7.2 bags cements
= 364.8 kg cements
| Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
construction workers how much time take one work or qty
please briefly explain calculating or estimating steel quantity for a RCC column?
why we create short columns under grade slab?
What is specific gravity???
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?
how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.
What is critical path method (c.p.m)?
water leak detection system question & answer
what is mc arther pile?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
how to caluclate sienerge qty in construction in ap
What is Architect-Prepared Contract?
What is type failure of road surface? how to repair the failure of road surface?