100mm block work 64 bags of cement used
150mm block work 286 bags of cement used
200mm block work 20 bags of cement used
patly work (M15) 293 bags of cement used
mortar ratio is 1:5
how to calculate volume of sand in cum & no. of bags
Answer Posted / Sushil Kumar
First, let's find the volume of sand required for each block work. Since we know the number of bags of cement and the mortar ratio, we can calculate the amount of sand needed.nFor a 100mm blockwork, with 64 bags of cement (assuming the mix is 1:5), you will require:n64 bags of cement * 5 = 320 bags of sand.nFor a 150mm blockwork, with 286 bags of cement, you will require:n286 bags of cement * 5 = 1430 bags of sand.nNow let's find the volume of sand required for pally work (M15). With 293 bags of cement, you will require:n293 bags of cement * 5 = 1465 bags of sand.nYou can now calculate the cumulative volume of sand required by adding up the amounts for each block work and pally work: 320 + 1430 + 1465 = 3215 bags of sand in total.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com
how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?
pls mail some more tecnical qustions at msaranya2610@gmail.com
Why do you want to work here
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
What is the per cu. mt. price of ready mix in Gujarat region.?
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
Which is the latest version of solidsworks?
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
can i get civil engineering test papers.......?????