Describe why concrete must be compacted after it is poured?
Answer Posted / dinesh koli
To get maximum density of concrete and to remove air and porosity from concrete
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
how to tie 10 legged stirrups
What are the techniques to measure road difference?
what is high type road and low type roads
how to preaper for interview wat they asked in interview give me idea
At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
What is the origin of name railway sleepers?
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?
Define What is the origin of name Railway Sleepers?
at what pressure ply-wood is obtained by gluing wooden sheets
Define What are the materials used in building a gravity dam?
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
Journal entry Gross salary 10000 Tax 1000 Employee contribution 2000 Employer contribution 2000