There is 15 KVA UPS using for single phase load.And 30
batteries of 12 V, 100 Ah are connected in series. Load is
taking 15 A current.What will be the back up power for this
UPS on same load?
Is it correct that batteries are connected in series ? The stored energy in each battery is 12 x 100 = 1200 Wh. Total = 36000Wh . The load in watts = 230 x 15 = 3500W ( app ) . Back up = 36000/ 3500 = 10 hr(app)
Is This Answer Correct ? | 2 Yes | 0 No |
What is the technical name of Transformer Oil ?
17 Answers Bhel, Don Bosco, Lanco,
How to calcualte the total number of cells required for particular UPS of some X KVA with 3 and 5 hours back-up?
What is the purpose of lighting Transformer used in Industries for Lighting illumination? Its necessary or not?
What is the drawback of class b amplifier?
what does mean ct knee voltage and burden
This is urgent!! What is a Thyristor-based 3-ways selector switch with Zero crossing control? how does it operate and where is it mostly found in a system?
what is the function of switch gear ?
Why can't we take NO LOAD TRIAL of motors having V1 mounting??
Necessity of transformer earthing
What is the use of insulation tester and how it is to be used.
why we have to particulary use ACB for below ratings,even available of MCB,MCCB with that range ?
2 Answers QRG Health City, Siemens,
draw vector diagram and +ve,zero sequence diagram of symmetrical three phase fault.