Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


There is 15 KVA UPS using for single phase load.And 30
batteries of 12 V, 100 Ah are connected in series. Load is
taking 15 A current.What will be the back up power for this
UPS on same load?



There is 15 KVA UPS using for single phase load.And 30 batteries of 12 V, 100 Ah are connected in s..

Answer / k.prakashchandra

Is it correct that batteries are connected in series ? The stored energy in each battery is 12 x 100 = 1200 Wh. Total = 36000Wh . The load in watts = 230 x 15 = 3500W ( app ) . Back up = 36000/ 3500 = 10 hr(app)

Is This Answer Correct ?    2 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

How to calculate 5hp 415v 3phase 2800rpm Ac motor full load current with out tourgh

1 Answers   Siemens, Spatel,


Three phase alternators are connected in star connection why?

13 Answers   Tanfac,


what is meant by neutral Ct of a transformer and how it connected in transformer

4 Answers  


why capacitance effect is predominant in underground cable transmission and inductance effect is predominant in over head line transmission?

0 Answers  


If a line which is drawing approximatly 2100amps what should be earthing streep size(using galwanize streep)?

2 Answers  


what is integrated ac contact circuit

0 Answers  


Single line digram for 11 kV to distribution use go,la and do

0 Answers   SK,


Why ACB is used in LT why not in HT and why VCB is used in HT why not in LT

1 Answers   GE,


IN MY INDUSTRIES 125 HP MOTOR USED FOR THAT ONLOAD AMPS UP TO 280 SO CAN I USE ONE LOWER KVA DG SET WITH STEP UP TRANSFORMERS THAT MEANS WITH LOW POWER INPUT TO GET CONSTANT HIGH POWER OUTPUT EG:125KVA DG SET = 250 KVA STEP UP TRANSFORMERS

1 Answers  


11Kv Dog conductor 6/0.186 formula Line Losses ? Length 4.85Km amper ..? 52 Pole Max Load 3200Kw

1 Answers  


how to calculate lux level in out door (yard lighting) please expalin with a example

1 Answers   IVRCL,


what will happen if phases are not shorted with neutral in transformer impedance test? and if neutral is not connected with ground?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)