List 5 major test cases for Lift

Answers were Sorted based on User's Feedback



List 5 major test cases for Lift..

Answer / rohit pathak

1. Whether easily able to carry peoples or things which needed to lift - means it has to spacious to that people can easily able to stand.

2. Whether it is working properly or not. - on clicking 1 it has to move on first floor on 2 to second.

3. what will happen when light goes off - if user is able to contact any one - phone facility should work there.

4. it has to comfortable to move up and down - user should not feel scare.

Is This Answer Correct ?    6 Yes 1 No

List 5 major test cases for Lift..

Answer / nitin

Lift should have
- separate button for each floor
- proper ventilation
- light
- Alarm
- Alarm with power backup / battary
- manual option to unlock the door with Key(in case of power outage)
- separate alarm for Over capacity should be there. (capacity check)
- Lift should not move in case of over capacity
- door should open only when lift is not moving
- lift should move only when the door is closed
- in case of power outage lift should work till the nearest floor to unload people /thing

- For automatic door there should be open and close button
- Door should open and close button should work only when lift is not moving
- there should be button on each floor to call lift

Is This Answer Correct ?    1 Yes 0 No

List 5 major test cases for Lift..

Answer / k.anusha

1.FIRST WHO CAN PRESS LIFT BUTTON IN THAT PARTICULAR PERSON CAN GET LIFT FIRST .
2.WHAT HAPPENED LIFT CAN STOP AT MIDDLE OF THE DESTINATION WHO ARE IN LIFT THAT PERSON PRESS ALARM ALARM CAN BE RING.
3. ANY BODY NOT CLOSE THE DOOR PROPERLY IN PROGRAM SET AUTOMATIC ALARM THAT CAN BE RING.
4.SOME TIMES PROGRAMMER CAN DISABLE 1 ST OR 2ND OR OTHER FLORES LIFT NOT STOP IN THAT PARTICULAR AREA. USER CAN PRESS 1 ST OR 2ND OR OTHER THE BUTTON DOES NOT WORKS.

Is This Answer Correct ?    0 Yes 0 No

List 5 major test cases for Lift..

Answer / bindu

1.How much time it will take to open and close.

2.Is there close and open button of the door is working properly.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Manual Testing Interview Questions

Tell me abuot your daily activities as a test engineer.

6 Answers   InterSoft,


what are testing Techniques? Pls answer

5 Answers  


why do testing are divided into stages primarily becoz: 1) different stage has different purpose 2)Stages makes the testing simpler 3)Different test run in different environments 4)The no of stages the testing is easier Which is the option need to be chosen its urgent

1 Answers  


What is the diff between IE and netscape in a web testing on a login page.

2 Answers   Mind Tree,


what is project and how many types of industry projects are there

1 Answers  






what is application state, base state, & call state.

1 Answers   TCS,


how u can do integration testing and what r the approaches u need to follow?

5 Answers   MBT,


When test plan will be prepared in v-model?

7 Answers   Siemens,


what the diff b/w verification and validation

8 Answers   College School Exams Tests, SunGard,


what is test metrics? difference between test matrix and test metrics? (Asked in Zensar Hyderabad today(17-1-12010))

1 Answers   Zensar,


What r the non-configurable items in the VSS for software configuration management?

2 Answers   IBM,


What are the tools of performance testing?

1 Answers  


Categories