Answer Posted / nitin
Lift should have
- separate button for each floor
- proper ventilation
- light
- Alarm
- Alarm with power backup / battary
- manual option to unlock the door with Key(in case of power outage)
- separate alarm for Over capacity should be there. (capacity check)
- Lift should not move in case of over capacity
- door should open only when lift is not moving
- lift should move only when the door is closed
- in case of power outage lift should work till the nearest floor to unload people /thing
- For automatic door there should be open and close button
- Door should open and close button should work only when lift is not moving
- there should be button on each floor to call lift
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How do u go about testing of web application?
What is the responsibility of programmer’s vs QA?
how to verify a button size (e.g Login Button) on a web page have same dimension prescribed by Client in UI Testing..??
Hi to all, im vaibhav i joined a MNC as a tester and i got a banking (HSBC) project can any one tell me as a fresher what kind of strategy i sholud use to perform better. thanx
What were the major challenges u faced while testing
Why is software testing required?
What is difference between V-Model and Agile Model?
Hi Friends, Can anubody give me brief overview of Automation tools.. (basics of tools-summary)of following tools? 1.Qualty Center 2.Load Runner 3.Win Runner 4.Q.T.P mail me on ...rachna.huda@gmail.com
Hi , Please send me the interview questions which were asked in manual testing mainly the test cases asked to write in interview.
What are the benefits of requirement traceability?
Artifacts in design phase of SDLC ?
How would u test and automate an Antivirus application ?
3. In a system designed to work out the tax to be paid: An employee has £4000 of salary tax free. The next £1500 is taxed at 10%. The next £28000 after that is taxed at 22%. Any further amount is taxed at 40%. To the nearest whole pound, which of these groups of numbers fall into three DIFFERENT equivalence classes?
need testing projects where can i find them
Should testing be done only after the build and execution phases are complete?