Sir,I have finished my B.E in the Stream of EEE.How Can I get
C license for Electrical???Please Tell me the way...My mail ID
is praba1003105@gmail.com Cell:7402474123
Answer / hari ramesh
To get a c license one must have completed be eee and have a minimum 2 years experience in ht equipments handling like transformer maintenance , ht cable laying, etc. To get that experience you need to work in electrical maintenance department in large plants ( any plant) like automobile manufacturing factory , foundry, etc. For example , tvs , wabco, hyundai etc . In chennai. After that you have to apply for license to govt. Then they will conduct an interview and if you pass you will get license. Of course vitamin "money" will be needed to speed up the process . Yet as it involves human life , interview and experience requirements cannot be bypassed using "m". To get the experience you have to work in those plants. To get work mostly reference is the best way for freshers
| Is This Answer Correct ? | 0 Yes | 0 No |
what happen if ac supply is fed to rotor of the alternator
what is the meaning of bus bar, in electrical panels.
13 Answers HLG Habtoor Leighton Group,
what is fault level of power system ?
what is the full form of KVAR
What is Diff. btw Cat-5 & Cat-6 Network Cables???
Explain working of PIU(Power Interface Unit) in Telecommunication,
7 Answers ACME, ATC, Bharti, HCL, INDUS, Pace Pharmaceuticals,
a solar energy installation utilizes a three phase bridge converter to feed energy into power system through a transformer of 400v/400v.the energy is collected in a bank of 400v battery and is connected to converter through a large filter choke of resistance 10ohms.1.the maximum current through the battrey will be.2.the kva rating of the input transformer is.
If one tertiary phase i.e. R,Y or B is earthed of a loaded type tertiary delta connected (Without load)of a power auto transformer, what is its advantage/disadvantage?
Which type of questions well asked. ?
If i have 200 test cases and we have to execute but we don't have time to execute all testcases.within 1 hour we have to execute that testcases and prepare the test report.so how i have to resolve this problem? is there is any technique in the testing.
Why and when NGR panel required. Is it necessary to design a NGR panel for a 6.6kV Alternator paralleling with Grid????
why is neccessary Tap changing of power transformer with in a certain time
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)