Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what are upstream faults and downstream faults in power system

Answers were Sorted based on User's Feedback



what are upstream faults and downstream faults in power system..

Answer / svasu30

please give me reply for this question as soon as possible

Is This Answer Correct ?    3 Yes 2 No

what are upstream faults and downstream faults in power system..

Answer / k.prakashchandra

Upstream means incoming , downstream- the outgoing

Is This Answer Correct ?    2 Yes 2 No

Post New Answer

More Electrical Engineering Interview Questions

why the weight of oil in transformer is specified (on the nameplate) in litres as well as kilo grams?

3 Answers   Reliance,


Merits & Demarits of Oil circuit & Air circuit breakers ?

0 Answers   Genco,


what is ACB

6 Answers  


why 30kva ups buzzing(hamming) sound?

2 Answers   Madhya Pradesh Electricity Board MPEB,


What is the better way of passing 400 amp from sending end to receiving end ? By overhead line or underground cable and why ? if underground cable then how much depth require ?

1 Answers   Aditya Birla, HCL,


why we can choose induction machine in wind mill? why can`t use synchronous machine?

3 Answers  


Why we use less dia. fuse and conductors at H.T. side, although we use higher dia. cables on L.t. side?

4 Answers   RRB,


As i want some model question paper in basic computer science and history please send me immediately sir

0 Answers   TNPSC Tamil Nadu Public Service Commission,


A well system is when , no. of bus bar is less or more. Tell me the concept of it.

0 Answers  


I NEED THE CABLE SIZE. I=800A AND P=315KW

2 Answers   ABC, Wipro,


TRANSFORMERS WITH DC SUPPLY

0 Answers  


1.why should we connect the measuring instruments in l.v side in short circuit test of a transformer? 2.why the power factor is less in open circuit test of a transformer?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)