how we check the thickness and line of ceiling plaster.
No Answer is Posted For this Question
Be the First to Post Answer
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?
ratio of rcc 1:1.5:3 grade of concrete ,7days& 14&28 days after curing how much strength of compressive strength in rcc slab
How to calculate labor requirement or requirement of labor projction for a proposed multistoried building for which quantities of different items of work has been already calculated stage wise ?
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
concrete cube strength if fail 1 no in 7 days .What is the solution
can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density
How much Pressure will apply in Water proofing Grouting method to fill the crack in beams or slabs?
What is stripping?
Coverage of 25mm.thick ratio of 1:4 cement mortar?
How to calculate the individuals quantities of cement,sand,and aggregate having 1:2:4 ratio for 50 cubic meter area.
1 Answers Aparna Constructions,
How to calculate sand,cement for 1:5ratio brick masonary
4 Answers IVRCL, Jamek, Prera Nirman Sewa, SPCL,
What are the responsibilities of a site manager?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)