For plain cement concrete we want use 20mm aggregate are 40mm
mm aggregate

Answers were Sorted based on User's Feedback



For plain cement concrete we want use 20mm aggregate are 40mm mm aggregate..

Answer / siva

IF the requirement is in footing level, 40mm may be used. If
it is in slab level (raft), 20mm may be used. Either way,
both can be used for PCC as per the specific requirement.

Is This Answer Correct ?    11 Yes 2 No

For plain cement concrete we want use 20mm aggregate are 40mm mm aggregate..

Answer / vijaya kumar

Hey Silly Question

Answer is - 40mm

Is This Answer Correct ?    2 Yes 6 No

Post New Answer

More Civil Engineering Interview Questions

W mm mix rasio

1 Answers  


what is density on steel bars?

3 Answers   AICL,


how to calculate the steel for 450 sft slab, please tell me the solution method

1 Answers  


Define What is a projection line?

0 Answers  


how to cal 1:4 in brick masonary work cement and sand?

1 Answers  






pls give me some basic informations in construction of a structure?

0 Answers   Prestige,


how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?

0 Answers   Simplex,


why & what is perchatage we are using fly ash in concrete?

0 Answers   Tulip,


how many moisture content in well seasoned timber

2 Answers  


As column is compression member then why we use steel to make it reinforced as it is already capable of taking compressive load?

2 Answers   MBL Infrastructures,


What is meant by dimensioning?

0 Answers  


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

0 Answers   Power Plant,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)