Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What is meant by sotf,lbb,power swing,pole discrepency,auto
reclose?



What is meant by sotf,lbb,power swing,pole discrepency,auto reclose?..

Answer / k.prakashchandra

sotf = switch on to fault ,lbb = local bus bar backup , pole
discrepancy = in 3 phase individually operated circuit
breaker ,all the three poles should close simultaneously
,otherwise there will be pole discrepancy .i.e, time lag
while closing .

Is This Answer Correct ?    30 Yes 6 No

Post New Answer

More Electrical Engineering Interview Questions

Does the dg syncronization sucessful in practical.

2 Answers  


what is the prosses for getting of 33kv licence (i have completed my engineering degree & working in 33kv substation for contract basis )????

0 Answers   Surana,


suppose if oil in transformer is not used than what constructional change you will do,for insulation and cooling?

2 Answers   ABB,


salam,hi, i need to know what the spesification of 300amp msb...

0 Answers  


what are all types of cross section in AC cables?

0 Answers  


is electrons really flow or they just vibrate at their position?

5 Answers   Bhel, HAL,


Define end float in a motor?

0 Answers  


working principle of UPS

15 Answers   Mantri,


sir, why alternator output is connected to delta side in to generating transformer? any reasion?

3 Answers   Kirloskar,


In Panels Main Incomer considered should be TPN or FP?

2 Answers  


why does same amount of current flow in the circuit inspite of any number of resistances in the circuit?

3 Answers  


A power transformer 4MVA/11KV/0.415Kv has been out of use in 12years. what maintenance actions/test need to be carried out before energizing.

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)