I am getting above 60 V as open delta voltage against single
phase unit ICT at tertiary delta formed and ICT getting
trippped on NDR. ICT tested and found in order. PTs provided
on tertiary are tested and in order. what may be the reason?
No Answer is Posted For this Question
Be the First to Post Answer
what is the other name of dc series motor
why impedance test in power cables?
- two pumps must work with them at the same time but if the first pump start the second pump must delayed for some time to start also , with motor rated power = 90 KW and rated voltage = 380 V and rated power factor = 0.85 lag please draw the power and control circuit for it and determine all circuit components parameters that you use it
Which do you think is the most significant cause of energy loss in a factory?
How to test transformer
why the generating voltage in India is 11kV or why is it be transmitted as multiples of 11
34 Answers ACC, Bhel, ECI Engineering and Construction, NTPC, SBL, Senthur Power Services,
How to check the specific gravity of the two 12 V batteries connected in series to a 24 V UPS and inverter ? will we have to disconnect all the connections and turn off the UPS and inverter or not ? will we have to check specific gravities in each cell of the two batteries ? what is the name of the instrument that is used to check the specific gravity and whats the procedure to check the specific gravity with it ? thanks
If a 1.5V,3W torch light bulb is connected in series with a 15HP/11.19KW,230V single phase motor and the combination is connected against a 230V supply and switched on than what will happen keeping all other parameters as it should be A)the bulb will glow normally B)the bulb will not glow C)the bulb will glow with extra brightness D)the bulb will burn out and if a fuse is connected to the above circuit will something happen to the fuse and what about the single phase motor will it be affected? Please explain with derivation
hi plz send me reliance placement papers..i.e electrical technical papers that have been asked in reliance test.
When we are working on transformer(132\11KV). we are going to isolate the transformer from both HV side and LV side. then we are applying grounding on both side. My question is that we required to isolate the VT which is still connected from secondary side.?
What magnetic circuit is formed in berry-type constructions and why?
How to calculate load requirement of a 50 flat apartment with 5 kw each unit,sizing of cable,transformer
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)