Answer Posted / arun
this is no accurate answer of que.
but normally 550/cum.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
What are the different approaches in designing the floors of the service reservoirs?
Exterior Joints,define
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
What is a tensile strength? What is the tensile strength of wood?
for pretensioning which will yield first and same for post tensioning?
What is geopolymer based concrete?
what is anchorage length,lap length and (dont remember the last one)
WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?
Water filter calculation formula
how to calculate MR 9(derivation)
manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.
what is conrete grade ,how are depent on concrete grad and size of concrete?
What is a kip?
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals