Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What should be the overcurrent, instantaneous overcurrent, short cicuit
current settings (i.e. how many times of motor full load and what is the time
duration) for a motor?



What should be the overcurrent, instantaneous overcurrent, short cicuit current settings (i.e. how..

Answer / harit

Overcurrent setting should be 120% of the Full Load Current of motor (time setting should be as per the recommendation of the manufacturer or Load characteristic)

instantaneous overcurrent & short circuit current settings should be 7 to 8 times of the full load current. Time interval to trip : should be set at zero (instantaneous).

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

different b/w counter poise and ground wire

1 Answers   L&T, TCS,


how we calculate electrical load on a building according to area?

0 Answers   HFCL,


what is the function of mccb?

6 Answers  


advantage and disadvantage of team work?

0 Answers   Ethio Telecom,


how can we design robots

0 Answers   Maruti Suzuki,


What is the full name of one of choke less lamp BLL

2 Answers  


what is a,b,c,d checks diesel generator?

1 Answers   AFMC,


The efficiency figures for energy efficient motors (in comparison with standard efficiency motor) can be generally higher by____%.

1 Answers  


protection used for alternator , feeder , transmission line

3 Answers   NHPC, Perfetti,


Is it required to do earthing in 2nd shop if earthed armoured cable is laid from 1st shop ?

0 Answers  


WHAT DO U MEAN BY THERMAL OVER LOAD RELAY& WHERE THEY ARE BUSED

4 Answers   L&T,


1 no. 22 kV feeder is taken from state electricity board. 350 MVA is the S.C. MVA. now i am feeding this feeder to HT Panel having 2 outgoings which further supply to 2 Transformers. Can you please suggest me the type & rating of cables are 3 of these cables same? or they are different? please help...............

2 Answers   TCE,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)