how do you select the ct/pt rating in substation



how do you select the ct/pt rating in substation ..

Answer / rajendra.s

First we should know the operational voltage of Substation,
transformer rating in MVA/KVA,Depending on this values we have to find the current,after getting all this values we can select the CT/PT ratings.


Rajendra Sawant
Miraj.

Is This Answer Correct ?    8 Yes 3 No

Post New Answer

More Electrical Engineering Interview Questions

what is different between DIGITAL and ANALOG?

3 Answers  


IN bateery size of positive is biger than negative .why?

8 Answers   Power Grid,


What happens if there is no nuetral in the power system?

5 Answers  


what will happen when power factor is leading in distribution of power?

10 Answers   AMET, JTO, Power Grid,


what are the major difference between 3phase 3wire and 3phase 4wire trivector meter?

2 Answers   L&T, NTPC,






Motor also having losses, we call KW rating. In transformer and generator having losses but we call KVA Rating why?

9 Answers  


hello everybody. what does an abnormal stator winding impedance or dc resistance show? thanx

0 Answers   Ansaldo,


Can anyone tell me some hints about what type of questions are asked by the interviewer by an Electronics engineer when company is installing an IPP and wants a team of engineers?

0 Answers  


what will happen if dc is supplied in acb or mccb or other circuit breakers?

1 Answers  


Is it possible to control the power in transmission lines by remote controlling method?? if yes explain in details???

1 Answers  


In the solution of load flow eqation, Newton raphson method is superior to the gauss siedal method because (a)the time taken to perform one iteration in the NR method is less when compared to GS method (b)the number of iterations required in the NR method is more compared to that in the GS method (c)the number of iterations required is dependant on the size of the system in the NR method (d)convergence characteristics of the NR mehod are not affected by the selection of the slack bus

1 Answers  


Why are calling lagging power factor is a inductive load?

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)