what is the number of cement bags (50 KG) required for
concreting 1000 Square Feet Slab . Thickness of slab 4 inch.
Answers were Sorted based on User's Feedback
Answer / pradeep
1000 sq ft * (4/12) = 333.33 ft^3
now,
333.33 ft^3 * 0.02832 = 9.44 m^3
take 1:2:4 ratio per m^3 cement 310 kg
now,
310 * 9.44 = 2926 kg
2926 * (5/100) wastage =3072 kgs
3072/50 = 61.44 take 61 bags
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / ranjith kumar hk
Generally we use M20 for almost concrete works so M20 ratio is 1:1.5:3,for 1m^3 for M20 grade it requires 8 bags of cement ,like wise for above question it becomes 9.3m^3 hence cement bags required are 9.3*8=74.4 approximately 75 bags
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / faizi
If I take it 1:2:3, it will be 140 bags of cement
Is This Answer Correct ? | 0 Yes | 2 No |
WHEN BRICK SIZE IS 3X5X9" , WHAT WOULD BE THE NUMBER OF BRICK REQUIREMENT FOR 100 SQFT AREA OF 5" width?
There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?
in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?
What is the weight of 10mm,20mm,40mm aggregate per cubic metre in kg?
8 Answers ABC Enterprise, Alstom, Badri Rai, IOCL, L&T, MICCO, NKC, PDC Construction,
Why should you consider yourself fit to be hired by jindal steel.
How to calculate shuttering plate weight
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
material used for mendrel use to bend epoxy coated rebar
0 Answers Saudi Aramco Shell Refinery Company SASREF,
What is bmc stands for in bmc software?
How will be cutting in timber plate size 600*400 column size
what is the minimum depth of cover required for pipes?
civil engineering means abut