what is the number of cement bags (50 KG) required for
concreting 1000 Square Feet Slab . Thickness of slab 4 inch.
Answer Posted / pradeep
1000 sq ft * (4/12) = 333.33 ft^3
now,
333.33 ft^3 * 0.02832 = 9.44 m^3
take 1:2:4 ratio per m^3 cement 310 kg
now,
310 * 9.44 = 2926 kg
2926 * (5/100) wastage =3072 kgs
3072/50 = 61.44 take 61 bags
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
For a washout valve why are two gate valves required in normal practice?
load combinations how many types for staad design purpose?
how to calculate quantity of bricks in circular manhole with examples.
Define What is Civil Engineering?
How do we test on design and style in a software?
how statics is different from dynamics
List out some of the software used in the construction sector to estimate cost and monitoring expenses?
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.
How can you distinguish between sorption, absorption and adsorption?
What is kn measurement?
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
how to preaper for interview wat they asked in interview give me idea
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.