How many cement mortor dry quantity required for 1m3 ?(1:4)
Answer Posted / pavan
total quantity required would be 1.57 cum of dry mortar,
including 20% wastage.
Dry volume of mortar is 30% more than wet volume.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
What is a hatch patterns?
Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?
Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
Define What is the tensile strength of wood?
why do we provide haunches in rcc box or underpasses?
What is the withdrawal force of steel nails?
Reinforcement details at hinged joint
Explain the design for rcc multi-storied building?
rcc floor to floor 4m. in column reinforcement where we provide lap in exact location.
What is the ratio of grades m5, m7.5, m10, m15, m20, m25, m30, m35, m40?
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??
WHAT GOAL DO YOU HAVE IN YOUR CARRIER?
what is the use in canals of longitudinal drains and cross drains in lining areas?