Wat are the elements consider in the shuttering load design calculation
Answer Posted / anupam nath
Wet load of concrete (2.6kg/cum) and live load (self as wel
as movement load). if we are using plate vibrator we have
to consider for vibration load (extra supporting
arrangement)
| Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
Wat is meant by Aecron brick?
residential buildings,mixing of concrete,structural,construction material,site handling.
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
calculate the quantity of water for 1:6 cement mortar
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
How to find the cuplock pipe qty in staging for Minor bridge?
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?
What is demising walls?
What is the density of Fiber reinforced concrete and give me the which fibers we can use in Concrete?
Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct
How did street originate in the plumbing term street ell?
what is the difference b/w full length and cutting length?
how many mason and labaur work for a 1 brass bricks plz let me know the calculate & how to made calculation for this and whats the formulas for this?
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream