Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


1 Cubic Meter = 487 Modular Brick, 1 Cubic Meter = 494 Non
Modular Brick, (As per Rate Analysis DSR 2012 Vol.-1)what is
the Brick Size ?
1 Cubic Feet = 13 Modular Brick, 1 Cubic Feet = 17 Non
Modular Brick. what is the Brick Size ?

Answers were Sorted based on User's Feedback



1 Cubic Meter = 487 Modular Brick, 1 Cubic Meter = 494 Non Modular Brick, (As per Rate Analysis DS..

Answer / shinu

* Modular Brick Size - 200mm X 100mm X 100mm
* Non Modular Brick Size - 229mm X 114mm X 70 mm

Is This Answer Correct ?    6 Yes 2 No

1 Cubic Meter = 487 Modular Brick, 1 Cubic Meter = 494 Non Modular Brick, (As per Rate Analysis DS..

Answer / nikhil

Modular Brick Size = 190 x 90 x 90 mm
With addition of plaster it counted as 200 x 100 x 100 mm
For 1 Cum :-
1 brick quantity including plaster (in CuM)
= 0.2 x 0.1 x 0.1 m
= 0.002 CuM
Total bricks in 1 CuM = 1/ 0.002
= 500 Nos.

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

Hi is it any equation or relationship that describe the stress-strain diagram in concrete deep beam?

1 Answers  


What is the strength of concrete with ratio 1:4:8 as per British standard or ACI

3 Answers   NHA,


plumbing CPVC fitting FTE Brass full form

0 Answers   RK,


is robosand to be use construction ? for slab ?, wall construction and plastering ?,is it give life?,which is best robosand or river sand ?

4 Answers  


why we can use dust in concrete insted of fly ash

0 Answers  


How much overlapping required for welding the reinforcement bars in Columns & beams

7 Answers  


What is the proportion of M 45 grade of concrete

2 Answers   Payal Construction,


What is the difference between one-way slab and two-way slab?

0 Answers  


which grade of steel is better for construction of building under earthquake zones ? why?

2 Answers   Noah Solutions,


design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal

0 Answers  


WHAT IS FLOOR AREA RATIO? Y IS IT NECESSARY? HOW TO CALCULATE IT?

1 Answers  


What is tha cross secional area of cover block

3 Answers   Raheja,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)