Answer Posted / fazil
practically 8 bags of cement need for 1m3 concrete
i.e 8 X 50 = 400 kg
as per IS code W/C = 0.45
400 X 0.45 = 180 lts of water needed
but water cement ratio must be taken from slump test
| Is This Answer Correct ? | 41 Yes | 3 No |
Post New Answer View All Answers
225 mm thick RCC slab, how many ton load slab can carry? for example if 33 ton truck loaded with soil, truck having 6 wheels. slab can take load or not? grade of concrete is M35 and slab design Fe500, slab desing one way slab.
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
What is braced excavation all about?
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
What is the outturn of Ceiling plastering
what is density of 20mm coarse aggregate.plz send answer my below adress e.mail
Define What is the force exerted by the Tacoma narrows bridge?
What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?
How much sand and cement requirement for 1 SQM 125mm thickness Brickwork
If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US
why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?
how much percent are used 20mm,10mm?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
What is the maximum crushing load in Kg & crushing strength in N/mm2 for M25 & M 15 Grade concrete
What are wooden shingles?