Answer Posted / samyak jain
The Water Cement ratio is
W/C=0.45 (IS 456-2000)
Now, Multiply the volume cement wth void ratio(30%).
W/Vc*1.3= 0.45
W= 0.585*Vc.
ANSWERE.
| Is This Answer Correct ? | 2 Yes | 7 No |
Post New Answer View All Answers
Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
Discuss some applications of modular elasticity?
in design case of structural member best suitrable percentage of steel limit is what
what is E
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
Minimum and maximum size of the building components
Which is the direction for positive angle?
What is different between DI Pipe and CI pipe?
procedure for preliminary selection of size of column of 5 storey building
What is the purpose of Chipping in the heavy foundation?
What do you mean by tolerance factor of concrete ?
Why nautical mile is different from statute mile?
During reclamation how can the occurrence of mud waves can be rectified?
why we are useing plastic under the lean concrete?and whts the advantage?