Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Does the
electricity supply
authority send its
customers power
(kW) or voltape
(V)? Asked by Ivan
Muliro

Answers were Sorted based on User's Feedback



Does the electricity supply authority send its customers power (kW) or voltape (V)? Asked ..

Answer / 7anoter4

This question is like this one:

"I get 100 cubic meter water or I get 1 kg/cm^2 [1 atm.
approx.] water pressure?"

I buy kwh but the Utility has to supply it at 415 V[+/-
5%,for instance] in order to use it.

Is This Answer Correct ?    2 Yes 0 No

Does the electricity supply authority send its customers power (kW) or voltape (V)? Asked ..

Answer / nagaraju.g

the power send to the people is kw

Is This Answer Correct ?    2 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

In a 11000/440 V transformer, when any one phase of 11 KV supply fails (ie., single phasing), what happens to the secondary voltage and why?

3 Answers   Secure Meters, TCS, Torrent Power,


What is LT? And specify the range of voltage?

10 Answers   HSL,


The unit of electrical charge is the

1 Answers  


WHAT HAPPENING TO TRANSFORMER???? i have the step down transformer rating 230/12v, power rating something.,,, ok. suppose iam giving 12v to secondary side,what will happen on primary side.,,,

6 Answers   Coastal Energen,


What types of I/O have you designed? What were their size? Speed? Configuration? Voltage requirements? Process technology? What package was used and how did you model the package/system? What parasitic effects were considered?

0 Answers  


1. A bomber drops a bomb from an aircraft flying at 2000 km/hr. at an altitude of 7km. The speed at which the bomb will strike the earth would be

0 Answers   KNJ,


slor cell made?

1 Answers  


What is thermal overload relay

2 Answers   Tech Mahindra,


How earthing/grounding done in aeroplanes and ships.

0 Answers  


please send previous exams question papers

0 Answers  


How Many Safety of Transformer

2 Answers  


how much current a 100 sq mm busbar will carry?

1 Answers   ABB,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)