the capacity of water tank in liters if the diameter is 3m,
and maximum height of water level as 1m.
Answers were Sorted based on User's Feedback
Answer / karthik
The capacity of water =3.14*1.5*1.5*1=7.065m3=7065Ltrs.
| Is This Answer Correct ? | 46 Yes | 3 No |
Answer / muraliyadav
The capacity of
water tank is
7068.37=7069litres
| Is This Answer Correct ? | 17 Yes | 3 No |
Volume = 3.14 x 1.5 x 1.5 = 7.065 cu m
density of water = 1000 kg/cum
total capacity of water tank = 7.065 x 1000 = 7065 litre.
| Is This Answer Correct ? | 8 Yes | 0 No |
Answer / bharath m,+91 8438238335/99806
7071 Litres of Water will be Maximum.
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / mallikarjun
volume=pie/4x(3x3)=7.069
density of water =1000
capacity of water tank is=7.069x1000=7069 liters.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / fawad
Vol of Tank = pie*r^2*h where r=d/2 ; 3/2 = 1.5
so = 3.14*(1.5)^2*1
Vol = 7.065 cubic meter. where=1cubic meter= 1000lit
so=7.065*1000=7065lit.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / biswajit sinha
The capacity of water = Pai*(D*D)/4*L
=3.14*(3*3)/4*1=7.065m3=7065Ltrs
| Is This Answer Correct ? | 0 Yes | 1 No |
Answer / bharath m,+91 8438238335/99806
7.071 Maximum Litres of Water
| Is This Answer Correct ? | 1 Yes | 4 No |
i m a btech 1st year student of civil branch. i want to do mba in future after having some work experience in civil field.is there any mba course made exclusively for civil engineers?
what is the bar bending schdule
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
what is the meaning of morth
extra how much quantity need to fill the actual excavated quantity.
What is the allowable silt content for concrete works?
what is the weight of concrete cube of 1ft*1ft*1ft? tell me weight in pound & in KG
what is the weight of sand,corrse aggregate and steel,for 1cum
1 Answers Gulf Asia, Jade Software, Sand,
What do mean by freeway ?
What Should be the CBR Value for Transported (Selected) Soil.whether it can be 5% or not ?
What are the various load combination in Limit state method?
2 Answers Developer Building Contracting, DMRC, Engineers India Limited,
What is the Requirements of indoor & outdoor Substation Construction? What is the main Safty Requirements for SubStation Construction?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)