Calculate the quantity of concrete for the following.
2 Under-reamed cast in situ pile of 300 mm dia. of 10.00 m
length.
Answers were Sorted based on User's Feedback
pile dia is 0.3m,
so, radious is 0.15m
quantity = 3.14*0.15*0.15*10
= 0.706
2 under reamed pile
so,
0.706*2
= 1.414 cubic meter
Is This Answer Correct ? | 6 Yes | 17 No |
i need the how much materials are needed for cubic feet of concrete?
What is indicate Fe250 in steel structure?
What is Dewatering ?
Why we take 162.2 in (d*d/162.2) to calculate weight of steel???
why we providing 40mm cover to columns & 25mm to shear wall
What is the basis of choice for cement sand plaster in ratio 1:4 and 1:6 on interior walls of a residential apartment.
why do we provide haunch for drains and culverts?
How to calculate the amount of Brick,cement & sand required for 1 cum of 115mm thick brick work with ratio 1:5 please give me an answer with detailed step
For G+4 storied building having 76000 sft per each floor, can you prepare schedule in such a way that structure should be completed with in 41/2 months and finishing be completed with in 51/2 months?
Pl. enlighten whether M20 grade RMC is suitable for columns & beams for 5 storied residential building
what are the tests to be done for grout material, and procedure for compressive strength test procedure for grout material?
yet i am not got any hallticket from aai junior excequtive exam.any one got application form from aai.
2 Answers AAI Airports Authority Of India,