Post New Answer View All Answers
how much cement and sand required for 100sqm of wall plastering in different proportions
How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor
How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
Trapezoidal section footing calculation of Volume & its Area
If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.
How to arrive d*d/162 , for finding the kg per meter , wt of steel
what is project?
What is difference between combin footing & rapt footing
What is limit state method and working stress method and ultimate method
What are the skills required to become an architect?
what is flashing?
the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none
How many are the types of joints?