what is a,b,c,d checks diesel generator?



what is a,b,c,d checks diesel generator? ..

Answer / kj

Most generator manufacturers have a requirement of the sets
being regularly serviced. The are also different codes
(e.g. fire codes) which require the regular servicing. The
type of service is usually designated as A to D.
An A service is usually a check of the generator to make
sure all systems are functioning correctly.
This steps up through oil and filter change to replacement
of consumable parts at D.
Consumable parts are the parts such and belts, hoses,
coolant pump, injectors, etc.
Each of these services are set by a time period or hours of
operation similar to the servicing of a car.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

Why 268hp induction motor taking different current in three different phases? (In which two phase having same current and one having higher value compare to other 2 phases.)

1 Answers  


in thermal overload relay class 10A indicate what

6 Answers   Reliance,


Why the suply frequency in INDIA is 50HZ

2 Answers   HCL,


phase colour is indicated by R Y B (red yellow blue) but in transformer i have seen U V W instead of (R Y B) have any meaning of this

3 Answers   Areva, Kim Yew,


During the testing of Electrical Equipment the test cables should not touch the equipments. For that testing engineers use to cotton rope to hang the cable from measuring Equipment to testing equipment terminal. Please explain the technical reason for this practice.

1 Answers  






why in dc generator field rheostate kept in maximum position?

1 Answers  


why all selected supply voltages are multiple of 11.i.e440,11 kv,33 kv,66 kv,110 kv etc

6 Answers   Suzlon, TCS,


what is the different ratings of ACB/VCB/SF6 which is used at HT side

3 Answers   Hosco,


why t/f are rated in kva. is it conserned with p.f.

3 Answers  


wat do knw aboot circuit breakers ?

9 Answers   IOCL,


How to select the proper VSD to operate high inertial load

0 Answers  


How to confirm the Phase shifting Transformer VECTOR GROUP relation , as below ZNy11.45d10.45-ZNYy0.15d11.15

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)