How to decide the fuse ratings for potential transformer

Answers were Sorted based on User's Feedback



How to decide the fuse ratings for potential transformer..

Answer / sanjeet

by knowing its max.current carrying capacity.

Is This Answer Correct ?    9 Yes 1 No

How to decide the fuse ratings for potential transformer..

Answer / sheikh

Transformer name plate denoted the primery and secondary
current therefore according to given current fusees on both
sides would be installed.

Is This Answer Correct ?    2 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

Arrangement of earthing materials.like what we put first charcol,then salt.then plate. Plz answer me about that.

1 Answers  


could anyone suggest project title

1 Answers   Engineering,


what is meant by MCB and MCCB? and what its full form?

7 Answers   Bajaj, JHM Hotels,


How to calulate Voltage Drop for perticular lentgh of busbar (Cu/ Al)?

1 Answers  


can you send me the placement papers of electrical engg. from companis like NTPC,DRDO,IOCL,HPCL,BPCL etc.?If,plz send as soon as possible.Thanks.

0 Answers   NTPC,






why they charge more bill for low power factor rather than high power factor

2 Answers  


I am in last year of Engineering.I want to apply for ONGC on GATE based score.They require Certificate of Competency as Electrical Supervisor.How can i get this certificate so I can apply for AEE(ELECTRICAL) in 2016

1 Answers   ONGC,


sir i ve applied for hindustan petroleum and power grid india ltd..and the exams on feb 22.can you pls send model papers and tell how to prepare for those.i need to get into any of these for sure.....

0 Answers  


What is the permissible sound level for 1000kva DG set and how the sound level is calculated.

1 Answers  


How is efficiency of DG set calculated? At many places I found the efficiency to be mentioned in percentage. But at some other places I found kWH/ litres. I want to know how dimensionless percentage value is arrived at?

0 Answers   ADS Spirits,


why do we have spikes enough to burn electronic boards, when generators are not grounded

0 Answers  


What will happen if supply frequency change in Transformer KVA rating ?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)