Answer / akrmsb

It is done by the formula 2(l+B)-deductions.

For example length of the room is 5 mts
and breath is 4 mts
then the qauntity of skirting will be 2(4+5)= 18mts.
from this subtract the deductions like doors.
if the width of the door is 1.2 mts then the final quantity will be 18-1.2=16.8 mts.

Is This Answer Correct ?    101 Yes 23 No

how to calculate Tile skirting ..

Answer / ronak shah

above answer is correct. it is always calculate in rmt.

Is This Answer Correct ?    34 Yes 8 No

how to calculate Tile skirting ..

Answer / akash choudhary

Yes it is absolutely correct it is measured in running meters(rmt)

Is This Answer Correct ?    17 Yes 3 No

how to calculate Tile skirting ..

Answer / madhu

If you need a quantifier of tiles you should measure the length with measuring tape of skirting tile
For Eg: A house is having 200rft length skirting tile and tile size is 2ft *2ft, keeping 4inch as skirting tile width we get 6tiles from 1 tile so that formula is
Total rft of skirting tile / (1 tile length* No of skirting tiles from 1tile)=No of tiles
200rft/(2ft*6No)=16.667~17 no of tiles required

Eg 2: if tile size is 2ft*4ft for the same 200rft
from 1 tile we get 6 skirting tile keeping 4ft as length
200rft/(4ft*6No)=8.334~9 no of tiles required
In site conditions, 2ft*4ft tile comes in 2no in a box so that we mention as 4box and 1 piece required for skirting tiles excluding wastage percentage

Is This Answer Correct ?    6 Yes 0 No

how to calculate Tile skirting ..

Answer / abdul malik

If the room is irregular then???

Is This Answer Correct ?    2 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

In the roof of a pumping station explain briefly the components of a waterproofing system?

0 Answers  


How can u prepare mix design for concrete?

2 Answers   L&T, Lafarge,


factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard

0 Answers  


WHAT IS MEANT BY ZERO VALUE IN QUANTITY SURVEYING

1 Answers  


what is idealized curve for concrere and steel

0 Answers   BARC,






What is approximate % of wastage considered for Marble and vitrified tiling works (flooring)?

3 Answers  


for a tachometer the additive & multiplying constant are 0 & 100 100 & 0 0 & 0 100 & 100

4 Answers   Ramky,


1) what is the difference between development length & overlap length ? 2) why extras are provided at top and bootom in a beam of slab? 3) why stirrups are provided at 0.3l at supports and 0.4l at center? 4) is column a compression memeber if yes how & beam is which type of memeber?

4 Answers   CDS, HCC, PPL,


How to find permissible diagonal tensile stress in reinforced brick work

0 Answers  


I heard Thump rule about beam depth is 1" per 1' length. Is this correct? If not please tell me the thump rule.Thanks.

2 Answers  


WHAT IS THE DIFFERENCE BETWEEN FACTOR OF SAFETY AND PARTIAL SAFETY FACTOR?

1 Answers  


describe about Hollow bricks? where the hollow brick "ll use& what"s the purpose?

1 Answers   BTL Infra, Jaypee,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)