How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??
No Answer is Posted For this Question
Be the First to Post Answer
How much depth of excavation have to do for Highrised builldings?if Raft foundation how much,and Pile foundation how much?
What is the difference between Autodesk revit structure and STAAD pro.? How much it is useful to structural engineer in modelling, analysis & design of RCC and Structural steel structures than STAAD pro.?
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
what are the advantages and disadvantages of using bentonite slurry in bored cast in situ piles, both in terms of design and execution point of view.
Every Engg. know that =dia*dia/162.2 is Steel weight Formula, But very less people Know that orgin of 162.2 asumption.
3 Answers ATS, Eurotech Construction, Juniper Networks,
Should column area deducted from form work measurement of slab in building?
How many number of bricks required for 1 cum & how much mortar quantity require for 1 cum
22 Answers Assurance, Campus Interview, R Tech Developers, Ramdev Construction, Synergy,
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
What is the slope of vertical wall ? quick ans
whats the concrete mix design ratio for M 35
1 Answers Rahman Industries, SPRRG,
Mention different types of roof systems?
what would be the design load of R.C.C Cooling tower per cell.?