I have an enquiry of develop solar power plant, 0.69/11kV,
1500kV/750/750kVA, Dy11y11 Transformer. I want to know what
does 1500kV/750/750kVA means? Sorry if this is a noob
question.

Answers were Sorted based on User's Feedback



I have an enquiry of develop solar power plant, 0.69/11kV, 1500kV/750/750kVA, Dy11y11 Transformer...

Answer / k.prakashchandra

It is 1500 KVA not KV,the total output via two secondaries
of 750 KVA each

Is This Answer Correct ?    1 Yes 1 No

I have an enquiry of develop solar power plant, 0.69/11kV, 1500kV/750/750kVA, Dy11y11 Transformer...

Answer / ajay

Generally current X'mer is specified as 500kv/750/750kva
that means.. First number stand for output in VA
second number stand for accuracy class and third indicates composite error

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

why we are using KVA rating for transformer,not KWh rating?

5 Answers   NTS,


how to define tell me about self

0 Answers   Bhel,


A double circuit with dog conductor 66KV Transmission line from wind farm evacuation to feeding substation having capacity of 25MW for transmission. Can same transmission network be considered for further expansion of Power & how much in MW. If we need to expand next 10-15 MW more will there any augmentation is required in transmission network? Kindly reply asap.

0 Answers  


what are the type of motors

3 Answers  


Why transformer called by KVA?

8 Answers   Reliance,






why we are caling 440 volt 3 phase supply instead of 660 volt 3 phase supply? because each phase as a voltage of 220 volt. if anybody know the answer for my question please send it to my mail id. thank you.

3 Answers   College School Exams Tests, Jindal Steel and Power, JIOL, NEC,


I am a electrical engg. diploma holder,applied for junior engineer (electrical),Kolkata RRB. Have I to attend all electrical,mechanical&civil portion in written exam.???

0 Answers   RRB,


why in generating station generation voltage is 11 kv

1 Answers   L&T, Usha Martin,


time constant of RC series circuit?

2 Answers   DVC,


1. Why a DC motor starter is called 3 point starter

21 Answers   ABB, CG, College School Exams Tests, Crompton Greaves, Infosys, Siva,


what will be the magnetizing current in the testing of 27 MVA transformer?

1 Answers  


How to determine the breaking capacity such as break down current and break down voltage for VCB and CT's.

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)