why we designed limit state method?
Answer / hrishikesh sharma
Actually the working stress method is used for general purpose, where similar structure found in nature. And the designer/ execution engineer can do the job as per his experience but in case of limit we can say lot of complexity of structure with load play an important role. before limit design method bearing capacity of soil with structure live and dead load consider upto the desired requirement and bending moment of structure is made.
Is This Answer Correct ? | 3 Yes | 0 No |
Explain what is alternate bid?
What will be compressive strength of concrete casted in PPC in the 7 days period with M20 grade.
how to placeing reinforcement in slab?
how many cement use for 1cum concrete for 25Grade.
How do we calculate absolute pressure?
how to calculate upthrust pressure of under ground water tank in wet soil?
minimum spacing of bars in column????as per code...???
7 Answers PNC, Rajesh Associates,
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
how can change 10mm dia @130c/c bar spacing to 8mm dia
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?