Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Key is put at the time of casting 1st lift of column to get–



Key is put at the time of casting 1st lift of column to get– –..

Answer / sjtbehera

It gives a bond strength to 1st lift and 2nd lift column

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

What is labour rate per kg for cutting,fixing and binding of reinforcement steet..??

3 Answers   GKC Projects Limited GKCPL,


how many blocks will come per 1 meeter squear

9 Answers  


Why provide strripus in a column minimum and maximum spacing.

1 Answers  


what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?

0 Answers  


Kindly tell me a book name to study for BIS exam

1 Answers   BIS, NAB,


I found a crack on a slab in my resi.bldg.There must be a leakage.what shall i do for preventing the leakage?

3 Answers   L&T,


Explain the various stages of the project planning process in construction?

0 Answers  


what is procedure to find the volume of material in M20 concrete?

6 Answers  


what is mix design of sand cement and and aggrigate of M10 M20 M25..

2 Answers   MNC,


design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal

0 Answers  


which is cover of r.c.c. column,beam and slab

5 Answers   Cube, RPP,


Sir how to find cutting length for footing steel bars in the shape of "u"

0 Answers   Geeta Industries,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)