Key is put at the time of casting 1st lift of column to get–
–
Answer / sjtbehera
It gives a bond strength to 1st lift and 2nd lift column
| Is This Answer Correct ? | 1 Yes | 0 No |
What is labour rate per kg for cutting,fixing and binding of reinforcement steet..??
3 Answers GKC Projects Limited GKCPL,
how many blocks will come per 1 meeter squear
Why provide strripus in a column minimum and maximum spacing.
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?
Kindly tell me a book name to study for BIS exam
I found a crack on a slab in my resi.bldg.There must be a leakage.what shall i do for preventing the leakage?
Explain the various stages of the project planning process in construction?
what is procedure to find the volume of material in M20 concrete?
what is mix design of sand cement and and aggrigate of M10 M20 M25..
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
which is cover of r.c.c. column,beam and slab
Sir how to find cutting length for footing steel bars in the shape of "u"
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)