Key is put at the time of casting 1st lift of column to get–
–
Answer Posted / sjtbehera
It gives a bond strength to 1st lift and 2nd lift column
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
what are the Task work of different labour.?
How to calculate Volume of Wet cement concrete for a specific grade?
How can you distinguish between sorption, absorption and adsorption?
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
five benefits of using standard terminology in the measurement process
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
The foundations are placed below ground level, to increase?
What is meant by Crystal Concrete?
what is education Cess.
what is the 0 value in quantity surveying
Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??
Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire
How do you maintain water pressure?
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)