what is the difference in between short time and continuous
rating?



what is the difference in between short time and continuous rating?..

Answer / kj

Machines are designed to be able to run at a maximum load
continuously.
With some machines there is a overload capacity. This means
fo a short time they can carry a higher load the the normal
maximum.
Short time rating may be stated as something like 1 hour in
24 hours. This is because more heat is produced when
overloaded and if the machine is not given time to cool
down it will fail.

Is This Answer Correct ?    2 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

Which motor has high starting torque

2 Answers   Greenko,


how we test a 3 phase motor on single phase supply....? HOW WE RUN A 3 PHASE MOTOR ON SNIGLE PHASE. supply for testing..? how we verify of a 3 phase motors 6 wire & name thame a1/a2/a3..b1/b2/b3 and c1/c2/c3 for connecting star delta starter ........i have only 1 phase supply ? help forum..........

1 Answers   Enercon,


What is the minimum percentage of power that a powerplant can support in ilanding mode ?

1 Answers  


why dc is not given to transformer

4 Answers  


why we using capacitor in single phase motor ?

14 Answers  






is it possible to run the any motor when winding grounded? how?

1 Answers  


what is the cost of a analog tachometer, for lab purpose/

0 Answers  


what is the AC Plant and how can do the work with parts and picture tell us 150 Tr

0 Answers   Wipro,


how to calculate the mesh earth network resistance in such substation, is there any recommended resistance values with references , thanks!

0 Answers   SRES,


what is relay multiplier

1 Answers   Atomic Energy Commission, Bhel, Wipro,


why the transformer primary and secondary windins vector groups vary? why it is something like Dy11 and not as Dy or Yy...

2 Answers  


Does dry and oil transformers both require dedicated neutral, because in my project we are using 2500kv dry star delta transformer, where they say neutral not required and even it is not provided in our substation. can u let me know

2 Answers   Voltas,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)