This is reqd for a 1MW Solar power plant..We have 2DC
outputs from the solar panels Connected to 2INVERTOR
panels.. Output from invertor is 3ph,280v,500kva,50hz.These
are connected to individual ACB.This has to be stepped up
to 11KV ,1250KVA SYSTEM.Now can I use (1) one more ACBTO
GIVE A COMBINED OUTPUT OF 1000KVA,280V & STEP UP THE OUTPUT
BY USING a single two winding 3 ph transformer 11kv/1250kva.
or (2)use the two outputs and connect to one three winding
transformer of above rating..Pls suggestwith details.
No Answer is Posted For this Question
Be the First to Post Answer
Why are the laminations insulated from each other?
i want all question & answers of the written exam
1 Answers Essar, L&T, MES, RRB,
Generally the incandescent lamps in bathrooms fuse due to high voltage at night.What is the simple solution of this problem?
substation+ plc system
If we need 4c× 50mm sq cable but it's not available so we can pull 4c×25mm sq two cables?
What is the different between Earthing & grounding?
In industries Power factor is maintained by installing a suitable KVAR bank, How is the PF maintained for domestic use, where is the capacitor bank connected
What is the difference between electrical earthing and electrical grounding?
What is the difference between electric and electronic circuits?
what is reactive power?
what do you mean by type zero control sytem ?Give an practical example of type zero contol sytem?
what will be the effect if we increase the excitation of a alternator??
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)