Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


the steel diameters(mm) as
6,8,10,12,14,16,18,20,25,28,32...etc these are used in
construction work but which mm size can be used for
different structural element such as
beams,columns,slabs,footing ?



the steel diameters(mm) as 6,8,10,12,14,16,18,20,25,28,32...etc these are used in construction w..

Answer / saif rizvi

This designer will decide which dia to be used where
But 6mm dia bar is not permited in any structural work
And vertical or main bar of column should not be less then 12mm dia
Other we can use any where as per design calculation

Is This Answer Correct ?    45 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

how many tonnes equals to one cubic feet?

0 Answers  


In cement concrete how to check a quality of material also proportion of material at site ?

0 Answers   NTPC,


significance of specific surface area of particles?

2 Answers  


for plaster what is the suitable sand.

3 Answers  


how much time will take for G+22 building for completion? activity wise like excavation,sub structure,superstructure,finishing,handover?

2 Answers   Raheja,


where will u provide construction joint on slab?

4 Answers  


component parts of a weir

4 Answers   Infosys, L&T, Zamil Steel,


How much steel needed for 1 m3 concrete for slab?

5 Answers  


one cricket ball through in chennai and jaipur same speed where bowl has fast speed

1 Answers  


What is a BBS?Find out the cutting length for a 600*600 foundation with 50 mm cover

1 Answers   CSL Group,


How to preparation billing for high rise building? anyhow can give the tips

2 Answers   L&T,


cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)