What is capicity of cap lock scffolding stander(vertical
member) and ledger of different size?
No Answer is Posted For this Question
Be the First to Post Answer
you are planning to paint a newly fabricated workshop building made of structural steel of 10 tons total mass.you are require to paint 1 cot of primer and 2 coats of top coat.How many liters of primer and top coat you will request
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
How to calculate manhole brick work quantity.
1 Answers ABC, L&T, Renaissance International, RR Constructions,
Will going from a 3-tap to 6-tap increase water pressure?
6mm dia rod legth 1feet
What is capicity of cap lock scffolding stander(vertical member) and ledger of different size?
What difference comes in constructing of house and a housing complex like society
Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand
why cutting length in design of beam is rounded more for -r/f & less for for +r/f
what is bending moment, for simply supported slab ? how do you calculate ?
what is called Bulk Density of aggregate?
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
0 Answers APGenco, Emaar, Madhucon,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)