in my working site. momentary jerck in electrical supply ocurred frequently which cause of multiple losses in our electrical equipements. how can we protect our electrical machines and equipements in this situation.
Answer / prakash g.r.
You must have a pucca earthing system to avoid such jerk.
| Is This Answer Correct ? | 0 Yes | 0 No |
Can Dy11 and Dy1 vector group transformers be paralleled?
What is the difference between PLC & DCS?
I use 20 nos led tube 4feet, in pathway 100mtr approximate, so what size cable i use for lighting
0 Answers Oman Cables Industry SAOG,
What is the working principle of CFL & T5 tube light & 40W tube light with electronic ballast?
what is tha online tapping and offline tappchange? which side connected primary or secondary and explain ?
11 KV distribution system where neutral is produced ?
4 Answers ciss, TATA, Tata Motors,
Induction generator has = A negative speed B negative slip C negative voltage D negative current
how to commissioning the genset with amf panel?
if a 2 ohm resistor,2 ohm capacitor and a 2 ohm inductor is connected parallely to 12v source.Then what is the value of current in each branch.Is current flows in each branch at the same time?If not so then provide the proper sequence
WITCH CARDS IN USE IN FIRE CONTROL PANEL.
Why ferranti effect occurred in leading p.f load?
How to connected to energy meter, pt, ct, ammeter, voltmeter and selector switch.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)