how to calculate the capacity of CT operated LT trivector
meters on a particular distribution transformer.
Answer / prakash g.r.
In distribution transformer, the LV side voltage is 433V(LL)
or 230V(LN). The secondary of the CT provided in the DT is
may be 5 A or 1 A. Hence the capacity of trivector meter is
230V, -/5 A or 230 V,-/1A.( - stands for primary which
varies with capacity of DT (ie) 200/5A or 400/5A like that.
| Is This Answer Correct ? | 0 Yes | 0 No |
why aggregate is placed all around substation ground.
what is the purpose for open delta connection in potential transformer
What is the difference between indoor and outdoor transformer
0 Answers Ama Airfield Lighting System,
what is difference between inductive and reactiveload?
what is rise time and half time
What does Transformer vector connection Dy11y5 means?
What is the reason that the humming sound is coming from the induction furnace panel?
Why fuse is? What will prevent by fuse?
cable selection formulas for electrical load.
what is saturation in transformer
it is possible to measurement of tension of slipring induction motor(SRIM)carbon brushes, any maesuring instruments are available in the markets.
what is emitter follower configuration? and what are it's features?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)