why scott connection is done why not two phases are directly
picked at the output of 3 phase transformer??
Answer / sudipt jena
Scott connection is done to get two phase supply from 3 phase input power. If we directly pick two phase from three phase supply , then the circuit becomes unbalanced.
| Is This Answer Correct ? | 0 Yes | 0 No |
hi , i have 150 kw loud and we need 50 m cabil,i want to know wich size cabil we use. thanks
We are having Chemical earthing pit the voltage between neutral to earth showing 22V how to solve that
What is spill current in protection relays?
what is difference Auto-transformer and ICT ?
which frequency is to be selected for measuring earth resistivity
1 Answers MSETCL Maharashtra State Electricity Transmission Co Ltd,
May I know how much values to be set for earth fault, over current and short circuit values at 11kv side? I have 11kv van 1250amps rating. Present it's taking load 80amps?
What is a Single Phase and Three phase Power? How it will be converted or transformed into another form?
Capacity of circuit breakers all types
What should be the height of basement according to NBCC code?
What is non-minimum phase transfer function?
for a slip ring induction motor if the stator is short circuited and rotor is given supply? how does the rotor rotate?
1 Answers TNEB Tamil Nadu Electricity Board,
Draw SLD for a panel has 500A Bus Bar rating, with 4 outgoing, each is 80 A (load current), showing the transformer and capacitor bank rating.
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)