Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


why scott connection is done why not two phases are directly
picked at the output of 3 phase transformer??



why scott connection is done why not two phases are directly picked at the output of 3 phase trans..

Answer / sudipt jena

Scott connection is done to get two phase supply from 3 phase input power. If we directly pick two phase from three phase supply , then the circuit becomes unbalanced.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

What will happen if we on 200kvr capacitor bank(11kv in bus)If there is low load on transformer (1.5 mva 33/11 kv)

0 Answers  


how much loading in terms of ampere can put on 5 MVA,33/11 KV TRANSFORMER having rated current 263 Amp ?????????

11 Answers   ABB,


What is the Frequency while we step up the voltage from 220V to 11KV? Is it possible? Explain it?

6 Answers  


Tell me all plants load factors i.e which plant operating on which load?

0 Answers   Bhel,


What the difference between ac and dc inductor an capacitor

0 Answers  


How to calcute the cable size for both HT and LT please specify the formula for that Regards Chethan C

1 Answers   Bhel, Student,


what is the diff of mcb and mccb

2 Answers   NSN, Sterling Wilson,


Electromotive force is provided by:(a) Resistance’s(b) A conducting path(c) An electric current(d) An electrical supply source

2 Answers  


HOW CAN YOU CALCULATE PRACTICAL EFFICIENCY OF A ASYNCHRONOUS INDUCTIONMOTOR OF 7.5KW,& MOTOR IS RUNNING WITH AVOLTAGE OF 410 VOLTS,& TAKING CURENT OF 13 AMPS

0 Answers  


types of arc quenching methodes

2 Answers  


What is the d/f between DOL & star delta starter & automatic star delta starter?

23 Answers   ACC, Dalkia, Engineering, Indeco, NINL, Novotel, RMH Control Systems, Wipro,


i wasted one year for the job after completed my btech what can i say about 1year time in interview

0 Answers   Infotech,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)