Dear all i want to know FEWA Electrical Supervisor Licence test Previous Year Questions ? If any body know please send to me shibin_75@yahoo.com
1 12665Make a list of materials and layout diagram for a 35hp motor, to be wired at 35meter away from the MDB in a chemical factory.
2 3388Draw SLD for a panel has 500A Bus Bar rating, with 4 outgoing, each is 80 A (load current), showing the transformer and capacitor bank rating.
1109Draw SLD feeding from the SS up to distribution board of the load, calculate cable size, breaker sizes, and meter for the following case: Ground Floor: electric room, pump room, 5 shops, each is 15 KW First Floor: 5 shops, each is 15 KW Second Floor: showroom 30 KW Service Loads: water pump 3 KW (3ph) , fire pump 3 KW (3ph), and one DB service 12 KW (3ph).
1423Draw an S.L.D of the main panel for a hospital, showing meter position. Essential loads are: 1) Equipment load 100 KW 2) Critical load 500 KW 3) Life AID Safety load 400 KW 4) NON-Essential load 200 KW 5) Other service loads 200 KW Calculate and suggest the size of the transformer, size of main cable, capacitor bank, and calculate the capacity of an emergency load having above first three mentioned loads is supplied by an emergency generator.
1226Post New FEWA Interview Questions
How do you create a blank document in word?
Explain loggin in laravel.
Explain the use of Burn Tool?
Please explain events in laravel?
What are basic methods of dataadapter?
Why it is recommended to avoid referencing a floating point column in the where clause?
What is script? Its advantages?
What does 7L67GFCA stands for in a marine engine MITSUI?
What is request handler?
Tell us what is your proudest accomplishment?
What are the types of binding available in wcf?
What is f4 command?
Do you get microsoft word with windows 10?
When to use inquire vs enquire?
Can we delete data from a view?