Answer / mansingh

1/2 CORE USED FOR NEUTRAL CONNECTION. IF ELECTRICAL LOAD IS
BALANCED THEN NO LOAD WILL BE ON NEUTRAL, IF LOAD IS
UNBALANCED THEN UNBALANCED LOAD WILL GOES THROUGH
NEUTRAL.SO FIRST WE SEE THAT LOAD IS BALANCED IN PHASES
THEN IN THIS CONDITION NO CURRENT WILL FLOW THROUGH
NEUTRAL,SO NOT REQUIRED FULL CORE.

Is This Answer Correct ?    5 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

Instead of single phase(220), if we apply Phase to phase (R&Y)supply (eg: for lighting fixture). what will be the power formula?

1 Answers  


how to calculate the kw, Amps consumed by a capacitor, give me the formula for KVAr into capacitance,KVAr into KW & KVA, Amps

3 Answers  


How over load relay works.

1 Answers  


In Energy meter How many rotation Equal to one unit.

3 Answers  


A 500 V shunt motor runs at its normal speed of 250rpm when the armature current is 200A. The resistance of the armature is 0.12 Ω. Calculate the speed when a resistance is inserted in the field reducing the shunt field to 80% of normal value and the armature current is 100A.

0 Answers   VECL,






what is the prinsiple of dc motor and construction and working ,application of dc motor.

0 Answers  


If the damper winding on the rotor of a synchronous motor is removed after starting what will happen?

7 Answers   IOCL,


at which voltage level arcing ground is occurs ??????????

0 Answers   TATA,


what is KWH

2 Answers  


We have a 12MW power plant & we inject 5-6MW power to Orissa GRID. For this we have a 33KV/11KV switch yard having 12.5MVA power transformer. Some times we draw power during emergency. It is observed that during Export or Import for load less than 500Kw the power factor is decreasing to 0.3 . This is happening only during export or import. During island condition TG power factor OK.Our capacitor bank is provided with our Power plant auxilliary load. Please suggest how I can we improve our power factor during low load (GRID).

3 Answers  


How to megger test 11 kV cable and the acceptance IR value

0 Answers   BVG, NFL, ONGC,


Classify drilling machines.

0 Answers   Ashok Leyland,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)