How to Calculate Materials Required for PCC 1:4:8 for 1Cum
& Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for
100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm
Steel bended in 90degrees what is the formula to calculate
Weight & Actual Length ?
No Answer is Posted For this Question
Be the First to Post Answer
what is the cover used for footings, columns, beams ??? why they differ & how they arrive??
What is the withdrawal force of steel nails?
how to calculate required shuttering material like props,spans,plates ..etc for a slab?
1 Answers NCC, Shoba Devlopers,
I need to do a Compressive Strength Test for a specimen made of Rubber. Before doing the Test on the Machine, I need to have an idea of the Minimum and Maximum Compressive Strength or Yield Strength of the specimen. How can I calculate that?
0 Answers University of Birmingham,
What is Definition Of Refuse Area In Building ?
1 Answers Arpee Group, Dudhwala Builders,
what is the bar bending schdule
How much quantity of steel will be used for commercial building consists of ground floor shops, first floor shops, second floor will be for offices and third floor will be office/banks. How many tons of steel is required to construct this building.
The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it
what is the lap length
How much steel required for 1000 sq ft slab 4" thickness.
how we control the temperature during concreting ?
what are the code used for residental building?