at the beam-column junction point tell me how much beam bars
should pass through column ring ? 3 or 2 or 1 . answer with
reason. if it is not happen then what will be he effect ?
Answer Posted / sjtbehera
ok look, there is no ring provided at the junction of
column and beam as per sp46 code. another thing what ever
rod obtain from design of the structure asll bar pass
through the column. please refer sp46 code for your
clearance.
| Is This Answer Correct ? | 3 Yes | 3 No |
Post New Answer View All Answers
can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??
I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com
Why we provide hair pin for shed
about higyway engineering
How to calculate plastering for elevated water storage tank
What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??
please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering
What is the quantity of cement in mix m20 concrete?
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
in one SQM plaster how much Cement and sand consumed in ratio 1:4
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
What is the primary difference between adsorption and absorption?
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????
How many mortar required for Brickwork of 1 Cu.m works??