What is the stripping time of shuttering for PPC concrete
Answer / sjtbehera
What is mean by stripping. If you ,mean deshuttrring, then it wii 14 days to keep
| Is This Answer Correct ? | 0 Yes | 0 No |
Define road.
Construction joint of beam & slab is provided at––
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
Describe the sections included in a typical bill of quantities
how much quantity are required like cement,sand,aggregate for (46*29*0.41)feet slab? how much this quantity can be calculated?
Quality control
what is diversion?
What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?
100 cubic meter of concrete will contain how much amount of cement, sand and aggregate to form a mix of M15
What is difference between code and standard and specification?
among the strectcher, header, english and flemish bond which has greater strength? where these bonds are preferred?????
weight of 32mm rod/m
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)