What is the stripping time of shuttering for PPC concrete
Answer / sjtbehera
What is mean by stripping. If you ,mean deshuttrring, then it wii 14 days to keep
| Is This Answer Correct ? | 0 Yes | 0 No |
How to plan a project
0 Answers Ahluwalia Contracts, SDS,
How much steel and concrit required in 1000 square feet slab?
Are cruise ships built for the transatlantic run?
Number of cement bags required for concreting 1000 square Feet slab of 4 inch thickness.
why we use min. 12mm dia bar in a coloum.
7 Answers BPCL Bharat Petroleum,
you are working as a QC in hihg rise building. when what"s ur responsibilities works?
what is the formula to calculate costing of rubble soling and wbm in road works?
Rectangular room is more effective than a square room because ––
What is the soil bearing capacity ? And how it should be to built a multistory building ?
3 Answers Clancy Networks, eConstruct, UltraTech,
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
briefly describe your ideal job?
how much CM required for Random Rubble masonry in CM 1:6
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)