what is a starter ??
Answers were Sorted based on User's Feedback
Answer / raghunath patil
it is a protecting device which can used for motor
protection to reduce the starting current or trip the motor
when it takes the exceed current than its rating.
| Is This Answer Correct ? | 15 Yes | 1 No |
Answer / manoj kumar rlaeddy. muthya
starter is an electrical device, which protects the motor from high starting currents. if there is any high currents occurs it will trip the motor and protects the motor from damage.
| Is This Answer Correct ? | 5 Yes | 0 No |
WHAT IS THE COOLANTS IN TRANSFORMER?
Mention the disadvantages of low power factor?
I have 12MW gas engine based power plant its running parallel with grid. my problem is When cpp run in island mode(without geb) that time geb transformer power factor is 0.2 lagging. When cpp run with parallel that time power factor is 0.94 lagging So how can i maintain power factor ofgeb transformer in island mode 0.9 lagging?
how we can calcultae the short circuit level for bus bar
0 Answers Jaiprakash, Panorama Apparels,
why high voltage is reqiured or L.T. panels? what type of tests should be taken for electrical panels?
A power transformer 4MVA/11KV/0.415Kv has been out of use in 12years. what maintenance actions/test need to be carried out before energizing.
Is there any Flood lighting system which produces more light (More power consumption 1000W,400W etc.,), white light and restart immediately after power restoration ?
what will happen when the dc supply is given to the capacitor?
IN THE CASE OF AN ELCB, IF THERE IS ANY UNSTABILITY BETWEEN PHASE AND NEUTRAL IT MAY TRIP. BUT MY QUESTION IS WHEN A LOAD IS CONNECTED IN BETWEEN P AND N, THE LOAD CONSUMES SOME POWER AND THERE IS A DIFFERENCE IN NEUTRAL WITH RESPECT TO THE PHASE. THUS ACCORDING TO ME, THE ELCB WILL AUTOMATICALLY OPERATES WHEN EVER THE LOAD CONSUMES-- I KNOW IT IS WRONG. BUT THE SOLUTION IS?????????
how can we make cable shedule for controll wiring ? which details must be required for it.?
If a HV Underground Cable (13.8KV) is layed in the ground below 1.5 Mtrs and any building construction is done on the Cable route. IS this allowable or Not? What should be the clearance. As per ISO construction on HV cable route is safe or Not? Why? Can any body suggest the site for my question?
in wind mill use 2100 kw asychronous generator ( induction generator ) rotor voltage : 3300,stator voltage : 690, rpm : 1511 type : MRL063E04 ' we check rotor resistance magger value found following. R-EARTH - 00 M.OHM,Y-EARTH-34 M.OHM,B-EARTH- 33M.OHM R-Y: 31 M.OHM, Y-B: 00 M.OHM,B-R :33 M.OHM HOW CAN I TAKE DECISION?pls ans. quickly
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)