What the codes used for Rigid Pavement and Flexible pavement.
Answer / sudhakar
for rigid pavement is 58-2002
for flexible pavement is 37-2001
| Is This Answer Correct ? | 7 Yes | 1 No |
What is difference between MS and Tor steel ?? Please ellobrate...or state its charactersitcs??
4 Answers CLG, Indiabulls, TOR,
how 1.52 factor comes while calculating no of bags of cement...from 1:2:4 design mix?
4 Answers CCCL, L&T, Vishwa Infrastructures,
how much quantity of cement(bags)concrete(20mm)and sand(sqft)is used in 1:3:6 PCC
how calculate the ms beam weight?Please give me formula details?
can stub column take the load as main column
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
IS code for Rolling Margin of steel
What is the acceptable percentage of slump in Mix concrete?
what are the forces acting on gantry girder
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
If specific gravity of cement is less than 3.15 what is the cause?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)